Steady-State System Ratings
Select one option below (one section)
Note: The short circuit strength is defined at the fixed series capacitor bank location, before the bank is put in service.This value is used to determine the metal oxide varistor energy rating.
Note: GE Vernova will make the determination of gapless or triggered air gap based on the economics of the system.
Note: GE will make the determination of number of segments based on the size of bank required to satisfy the design requirements.
Note: Select this option if subsynchronous oscillations are a concern.
Note: Select this option if your line breakers do not have enough interrupting capability to interrupt a compensated line.
Note: IEEE 693 Seismic Designation of Low, Medium, or High.